Why Eight Banks Backed Basrah Gas (BGC)

In 2021, an Iraqi gas venture borrowed $360 million without shareholder guarantees. The repayment structure, its subsequent construction record and a second financing proposal reveal where this precedent can be useful.

In June 2021, eight international banks joined a $360 million loan to Basrah Gas Company. The agreement was unusual for Iraq. The lenders did not require Shell, Mitsubishi or the Iraqi state-owned shareholder to guarantee repayment. Instead, the transaction drew on revenue from condensate exports. Some of the gas processed by the company would be supplied to Iraq’s electricity system. The proceeds from exporting another product would help service the debt. The arrangement helped finance a major expansion of gas-processing capacity. Four years later, the company had completed its new plant and was seeking another large loan.

The case offers a rare opportunity to examine how an Iraqi energy company secured international finance, what happened after the money was committed, and how far the model might be replicated.

01 | A Company With Two Markets

Basrah Gas Company (BGC) began operations in 2013. It collects and processes associated gas from three major oilfields in southern Iraq: Rumaila, West Qurna 1 and Zubair. Associated gas is released during oil production. Without sufficient processing infrastructure, much of it is burned at the wellhead.

BGC converts this gas into products with different markets. Dry gas supplies Iraq’s domestic energy system. Liquefied petroleum gas (LPG) and condensate can be sold locally or exported. The company’s ownership also spans different institutions. Iraq’s South Gas Company holds 51%, Shell 44% and Mitsubishi Corporation 5%.

By 2021, BGC was an established operator. It had processing plants, pipelines, storage facilities and export operations. It also had an ambitious expansion programme. The Basrah Natural Gas Liquids (BNGL) project, located at Artawi in Basra, would add two processing trains. Each was designed to handle 200 million standard cubic feet of gas daily.

The expected investment was approximately $1 billion.

02 | The Condensate Connection

The financing was arranged by the International Finance Corporation (IFC), the private-sector arm of the World Bank Group. IFC provided $137.76 million directly. Another $180 million came through eight commercial banks, including Citi, Deutsche Bank, Société Générale and Standard Chartered. A further $42.24 million came through IFC’s managed co-lending programme.

The structure followed a familiar principle in commodity finance: lenders may be willing to advance funds against identifiable export earnings. In BGC’s case, condensate export proceeds were directed into an offshore collection account to repay the loan. This was a form of pre-export finance.

Its importance becomes clearer against Iraq’s operating conditions. The company sold dry gas into the domestic energy system, where payment performance could be affected by public finances. Its export business generated receipts through international markets. Malcolm Mayes, then BGC’s managing director, explained in 2021 that the financing would help sustain investment through changes in oil prices and the Iraqi government’s ability to pay its bills. The loan therefore addressed an identifiable commercial concern: maintaining capital expenditure when operating revenues were exposed to volatility.

It also carried an important qualification. IFC confirmed that the shareholders had provided no repayment guarantees. That did not leave the banks without protection. The public record identifies the export-collection mechanism, though the complete security documents and repayment covenants have not been disclosed.

The transaction was described by specialist lenders as Iraq’s first pre-export financing of this kind.

IFC’s earlier investment disclosure went further, suggesting that the proposed green loan might be the first globally dedicated specifically to reducing gas flaring. That possible distinction was not established in the final announcement.

Newsletter: RUSUL | Energy & Institutional Research

03 | The Institutions Behind the Deal

The transaction brought together institutions with different responsibilities. The Iraqi Ministry of Oil supported the expansion. South Gas Company represented the state’s majority interest. Shell and Mitsubishi contributed to the venture as international shareholders.

IFC arranged the financing and mobilised commercial lenders. Ihsan Abdul Jabbar Ismail, then Iraq’s oil minister, publicly endorsed the agreement. Mayes represented BGC. Sérgio Pimenta, IFC’s regional vice-president, presented the investment as part of a wider effort to attract private capital. Société Générale served as a mandated lead arranger, according to transaction reporting, while Norton Rose Fulbright advised the lenders.

These roles help explain the institutional breadth of the agreement. They do not reveal who negotiated individual security provisions.

04 | From Financing to Production

The original IFC investment was approved in November 2019. The loan was signed in June 2021. In May 2023, BGC inaugurated BNGL’s first processing train. Commissioning continued afterwards. The second train was commissioned in April 2025 and formally inaugurated that July. The completed expansion increased BGC’s nominal processing capacity to approximately 1.4 billion cubic feet daily.

It was a substantial addition to Iraq’s gas infrastructure. The timetable, however, had changed. The original investment disclosure anticipated reaching the higher capacity by 2024. Nor does installed capacity establish the volume of gas actually recovered. Processing performance depends on available feed gas, operating reliability and the infrastructure connecting fields to plants.

Industry reporting in August 2025 recorded higher LPG exports following the second train’s commissioning. The publicly available evidence does not yet provide a complete account of sustained plant utilisation or realised emissions reductions attributable to the expansion.

These distinctions matter when assessing development outcomes.

05 | Another Loan, Another Asset

In September 2025, BGC and IFC announced plans for a further financing package of up to $500 million. This time, the proposed investment concerned infrastructure at Umm Qasr, including storage and export-terminal improvements. It also included refinancing outstanding obligations from the 2021 facility. The change in investment focus is revealing.

The earlier financing supported increased processing capacity. The next proposal concerned infrastructure needed to store and export the products. This does not establish that the port had become a binding constraint. It does show that BGC’s expansion programme extended beyond the processing plant. The financing record also requires care. IFC approved the second investment in January 2026, but its disclosure was still marked Pending Signing in the latest published update.

Credit approval and completed financing remain distinct milestones.

06 | The Limits of Replication

The Basrah Gas model is relevant to other infrastructure investments in Iraq. Its application elsewhere would depend on several conditions.

A company needs export revenues that lenders can identify and assess. It must have the legal authority to direct those revenues towards debt repayment. The underlying contracts must also withstand disruptions to production, shipments and payments.

Many electricity projects do not meet those conditions. Their revenues depend largely on domestic purchasers, tariffs or government budgets.

Even companies with export earnings may face restrictions on assigning receivables or establishing effective account controls. For a lender, the distinction affects credit risk. For a government, it affects the design of financing and commercial agreements. For a contractor, it affects whether an approved investment can generate the payments needed to procure equipment and complete construction.

NET ASSESSMENT

Basrah Gas provides a documented example of international lenders financing a majority-state-owned Iraqi energy company without shareholder guarantees. Its expansion was subsequently built. Its owner then pursued financing for the next part of the infrastructure chain.

The broader lesson is conditional. Reliable access to export earnings can strengthen an energy company’s financing options, provided the contracts, institutions and physical infrastructure support those revenues.

Basrah Gas demonstrates what was possible in one Iraqi venture. Its wider relevance will depend on understanding why those conditions held.

RESEARCH NOTES & PRIMARY SOURCES

  1. IFC, Basrah Gas Company, Project 39146. Investment approval, original scope, cost and preliminary green-loan classification.
  2. IFC, 29 June 2021. Final financing amounts, participating lenders and shareholder non-recourse.
  3. Basrah Gas Company, 2021 announcement. Public statements from the company and participating institutions.
  4. The National, 29 June 2021. Malcolm Mayes on payment volatility, exports and financing.
  5. Uxolo, Development Finance Awards 2021. Pre-export finance, condensate collection account and transaction advisers.
  6. BGC, BNGL development; MEES, August 2025. Project development, commissioning and capacity.
  7. IFC, BGC II, Project 50733. Proposed second facility, port investment and approval status.